AXELYUM MEDTECH / PERFU+3

Evidence before industrialisation.

Our roadmap prioritises a minimal, integrated and verifiable mechanical demonstrator.

Status as of

An engineering programme, not a production-ready product.

A structured engineering dossier exists, but the integrated mechanical solutions require independent review, design decisions and demonstrator construction.

This page evolves: it is updated as studies and professional discussions progress. Last updated: .

Documented

Requirements & studies

Design dossier, mechanical assumptions, analyses and configuration records.

In progress

Integrated feasibility

External review, force paths, interfaces, assembly and design choices to be resolved.

To be demonstrated

Prototype & performance

Physical mechanical demonstrator, instrumented measurements and safety tests.

Progress log

A project that moves forward, dated and traceable.

Milestones are added here as studies and partner discussions progress.

  1. Design dossier and feasibility review

    Design dossier documented. P3-L1 feasibility review being prepared and search for a mechanical engineering partner under way. No integrated prototype has been validated to date.

Engineering pathway

Four work packages, one controlled progression.

Each gate depends on verifiable engineering evidence. Series manufacturing will not be initiated solely on the current dossier.

L1

Feasibility audit

Independent design and feasibility assessment.

L2

Engineering & integration

Close kinematics, forces, guides, safety and bill of materials.

L3

Mechanical demonstrator

Fabrication, assembly and iteration.

L4

Physical verification

Instrumented testing against acceptance criteria.

After proof of concept

A phased industrial pathway.

Once functions have been demonstrated, further stages may include design for manufacturing, quality, necessary investigations, regulatory strategy and selection of an industrial partner.

Timing depends on technical results, resources and partnership agreements.

What we do not claim

  • ✓No validated final integrated prototype
  • ✓No commercial device
  • ✓No clinical or military qualification
  • ✓No regulatory clearance obtained
Professional dialogue

Discuss a PERFU+3 feasibility review?

A non-confidential scoping brief is available upon request. Detailed material is selectively shared, including under NDA where appropriate.

Contact us ↗